The Process Of Installing A Septic System
What You Need To Know About The Process & Timeline Of Your Septic System Installation
Understanding the Septic System Installation Process: A Step-by-Step Guide
Installing a septic system is a critical process for any property without access to municipal sewer systems. At JWSR LLC, we want our customers to feel confident and informed about every step of the process. Here’s a detailed breakdown of how we handle septic system installation from start to finish.
Step 1: Initial Consultation and Site Evaluation
Before any work begins, our team meets with you to understand your needs and evaluate your property. This includes:
- Determining your household’s wastewater needs.
- Inspecting the site to assess soil type, drainage, and topography.
- Ensuring compliance with local regulations and codes.
This step helps us determine the best type of septic system for your property.
Step 2: Design and Permitting
Based on the site evaluation, we design a custom septic system tailored to your property. Our team handles the necessary paperwork and obtains permits required by local authorities. This ensures your system meets all legal requirements and is approved for installation.
Step 3: Site Preparation
With permits secured, we prepare the site for installation. This involves:
- Clearing and leveling the area where the septic system will be installed.
- Marking the locations for the tank, drain field, and connecting pipes.
- Taking measures to protect nearby structures and landscaping.
Step 4: Excavation
Using our specialized excavation equipment, we dig the necessary trenches and holes for the septic tank and drain field. This step requires precision to ensure proper placement and alignment of all components.
Step 5: Tank Installation
The septic tank is delivered to your property and carefully installed in the excavated area. We ensure it is level and securely positioned to prevent shifting or settling over time.
Step 6: Drain Field Installation
The drain field, or leach field, is an essential part of the septic system. We:
- Install perforated pipes that allow wastewater to seep into the surrounding soil.
- Backfill the trenches with gravel and soil to ensure proper drainage and filtration.
- Test the system to verify everything functions as designed.
Step 7: System Connection
Once the tank and drain field are in place, we connect the plumbing from your home to the septic tank. This involves installing inlet and outlet pipes, as well as any additional components such as pumps or filters, depending on your system design.
Step 8: Inspection and Testing
Before the system is finalized, we conduct a thorough inspection to ensure:
- The tank and pipes are installed correctly.
- The drain field is functioning as intended.
- All components comply with local regulations.
Local authorities may also inspect the system to provide final approval.
Step 9: Backfilling and Landscaping
After the system passes inspection, we backfill the trenches and cover the septic tank with soil. If requested, we can also assist with landscaping to restore your property’s appearance.
Step 10: Customer Orientation and Maintenance Plan
We walk you through the completed system, explaining how it works and what steps you can take to keep it functioning efficiently. We provide a maintenance schedule and tips for proper septic care, including:
- Avoiding flushing non-biodegradable items.
- Regularly pumping the tank (every 2-5 years). Personally, we get our tank pumped every 2 years.
- Monitoring water usage to prevent overloading the system.
Trust JWSR LLC for Your Septic System Needs
At JWSR LLC, we take pride in delivering high-quality septic system installations that meet the unique needs of our customers. Our step-by-step process ensures a smooth experience from consultation to completion. Ready to get started? Contact us today to schedule your consultation!
Ready to work with JWSR?
Let's connect! We’re here to help.
Send us a message and we’ll be in touch.
Or give us a call today at 862-268-2510